Brisbane 2032 is being sold as a sustainable Games, and the venue program now has a budget, a delivery authority and construction underway at Victoria Park. For the architects, hydraulic engineers, plumbers and builders who will deliver it, the useful question is narrower than the headlines: what will a sustainable Olympics 2032 actually require of the products you specify?
This article sets out the commitments as they stand in October 2026, separates the binding ones from the aspirational ones, and explains what they mean for drainage, grates and access covers on Games venues. We make those products, so we have a commercial interest in the answer. We’ve tried to be straight about where that interest ends.
Key takeaways
- The measurable target is 6 Star Green Star. New and significantly upgraded Brisbane 2032 venues will target a 6 Star Green Star rating from the Green Building Council of Australia (GBCA). That’s the requirement that reaches individual products.
- “Climate positive” has been softened. It was written into the 2021 host contract, then replaced in a 2024 addendum with an aim to remove more carbon than the Games emit. Specify against the Green Star and procurement requirements, not the slogan.
- 17 venues, $7.1 billion, hard deadline. The Games Independent Infrastructure and Coordination Authority (GIICA) is delivering 17 new and upgraded venues. Procurement follows Buy Queensland, which favours local, sustainable suppliers.
- Certified products earn Green Star points. Green Star Buildings rewards products with recognised third-party certification. Our HEELGUARD® systems hold GreenTag PlatinumHEALTH (cert. #2859).
- Durability is a sustainability feature. A drain that lasts the life of the building and is recyclable at the end beats one replaced twice before 2050.
- Paralympic accessibility is non-negotiable. Every grate in an accessible path of travel has to meet AS 1428. Our 5 mm aperture sits well inside the 13 mm limit.
What sustainability measures is Brisbane implementing for the 2032 Olympics?
In short, Brisbane is implementing six main measures:
- 6 Star Green Star venues. New and significantly upgraded venues will target 6 Star Green Star (“world leadership”) under the GBCA’s rating system. (Queensland Government)
- A carbon removal aim. Brisbane 2032 aims to remove more carbon from the atmosphere than the Games emit, alongside the state’s net zero by 2050 target and 70% renewable electricity by 2032.
- Reusing existing venues. Around 20 existing or temporary venues will host events alongside GIICA’s 7 new and 10 upgraded venues. (GIICA)
- Legacy-first design. Venues are designed for community use first, then overlaid for Games time.
- Local, sustainable procurement. The Q2032 Procurement Strategy applies Buy Queensland, which favours local suppliers and contributes to emissions-reduction targets.
- Circular economy and resilience. The state has committed to accelerating a circular economy, protecting ecosystems and improving environmental resilience through the Games.
Brisbane 2032 sustainability at a glance
| Commitment | Status (Oct 2026) | What it means for specifiers |
|---|---|---|
| 6 Star Green Star for new and significantly upgraded venues | Stated target | Product choices feed Responsible Products and materials credits |
| Remove more carbon than the Games emit | Aim, not a contractual obligation since the 2024 host contract addendum | Embodied carbon and product life will be scrutinised, but via rating tools, not the contract |
| Net zero by 2050; 70% renewable electricity by 2032 | Queensland Government targets | Affects operational energy, less so drainage |
| Buy Queensland / Queensland Procurement Policy 2026 | In force from 1 January 2026 | Queensland manufacturers and SMEs are actively sought |
| 17 GIICA venues, $7.1B program | Funded; early works at Victoria Park underway | Procurement pipeline running now through 2031 |
The honest version: “climate positive” isn’t binding any more
Brisbane was the first host city contractually required to deliver a climate-positive Games. That changed quietly. An addendum signed by the IOC, the State of Queensland, Brisbane City Council and the Australian Olympic Committee in April–May 2024 replaced the climate-positive wording with an aim to remove more carbon than the Games emit, as reported by QUT’s Professor Marcus Foth in The Conversation.
The IOC’s explanation:
“[The IOC] took the decision to no longer use the term ‘climate-positive’.”
— IOC statement, via The Conversation
The IOC says the underlying requirements haven’t changed. Critics say the commitment is now an unenforceable aspiration. Either way, the practical consequence for the construction industry is the same: the requirements that will actually be checked are in the Green Star rating and the procurement criteria. That’s where specifiers should focus, and it’s where a supplier’s claims either stand up or don’t.
Where the work is: the 17 GIICA venues
GIICA is delivering 7 new and 10 upgraded venues under the $7.1 billion Games Venues Infrastructure Program, jointly funded by the Australian and Queensland governments. The Federal Government is contributing $3.435 billion. July 2032 is the hard stop.
Progress at October 2026:
- Brisbane Stadium (Victoria Park): 63,000 seats. GIICA took possession of the site in June 2026 and early works are underway. Dual Early Contractor Involvement (ECI) contractors have been appointed.
- National Aquatic Centre (Victoria Park / Centenary Pool, Spring Hill): Arkhefield with aquatic specialists Liquid Blu as principal architects. GIICA took possession of Centenary Pool on 1 September 2026. It will host swimming, diving, water polo and artistic swimming.
- Indoor sport centres at Logan and Moreton Bay, plus upgraded Barlow Park (Cairns) and Sunshine Coast Stadium: principal design consultants appointed.
- Upgrades at Chandler (Brisbane Aquatic Centre, Anna Meares Velodrome, BMX Centre), the Queensland Tennis Centre, the Brisbane International Shooting Centre, Rockhampton Flatwater Facility, Redland Whitewater Centre and Toowoomba Showgrounds.
- Athletes’ villages at Brisbane Showgrounds, Royal Pines (Gold Coast) and Maroochydore City Centre (Sunshine Coast), delivered separately from GIICA’s program.
What each venue type asks of its drainage
| Venue type | Drainage challenge | What to specify |
|---|---|---|
| Aquatic centres (National Aquatic Centre, Chandler) | Constant splash-out, chlorinated water, warm humid air, bare feet, wheelchairs | 316 stainless pool deck grates, slip resistance, heel- and toe-safe aperture, high-flow perimeter channels |
| Stadium concourses and plazas (Brisbane Stadium) | Huge wash-down volumes, service vehicles, event crowds, heat | Trench drainage rated to the real traffic under AS 3996, often Class C or D near service roads with Heelguard grates. |
| Indoor sport centres | Entry thresholds, wet areas, change rooms, accessible bathrooms | Heelguard Threshold drainage for step-free entries; linear shower drains |
| Athletes’ villages (legacy housing) | Balconies, level entries, bathrooms that become homes after 2032 | Heelguard Balcony drainage, flush thresholds, Livable Housing step-free entries |
| Public realm and forecourts | Service pits in stone paving, feature water | Infill access covers, curved grates using Heelguard grates. |
How drainage earns its place in a 6 Star Green Star building
A drain is a small line item. In a Green Star submission, though, every product either contributes to the materials credits or doesn’t, and the GBCA’s Responsible Products program is the mechanism.
Green Star Buildings awards points across Responsible Structure, Envelope, Systems and Finishes credits when a minimum percentage of materials (by cost) are “responsible products”: products holding a certification the GBCA recognises. GreenTag is one of them.
What a sustainable drainage specification looks like
| Criterion | Why it matters for Brisbane 2032 | Paige Stainless position |
|---|---|---|
| Third-party product certification | Counts toward Green Star Responsible Products credits | HEELGUARD® grate & frame and grate & tray: GreenTag PHD PlatinumHEALTH, cert. #2859, “no toxicity issues of concern” |
| Recyclability | Circular economy commitment | Stainless steel is recycled without loss of quality; about 85% is recycled at end of life (ISSF / Yale study) |
| Recycled content | Embodied carbon | Varies by mill: 44% global average, around 70% in Europe and the US |
| Service life | Avoided replacement = avoided embodied carbon | Built for the life of the building. Lifetime warranty on materials, 10 years on workmanship |
| No coatings to fail | Durability and material health | Stainless needs no paint or galvanising, so nothing to flake into the drainage path or recoat |
| Local manufacture | Buy Queensland, freight emissions | Designed and fabricated in Caboolture, QLD, since 1993 |
| Accessibility | Paralympic Games and legacy use | 5 mm HEELGUARD® aperture vs the 13 mm AS 1428.1 limit |
Durability is the overlooked sustainability metric
The cheapest drain on tender day is rarely the lowest-carbon drain over 30 years. Polymer and plastic grates fade and embrittle in Queensland sun. Galvanised coatings break down in chlorinated and coastal environments. Each replacement means new material, new freight, demolition of the old unit and often a closed venue while it happens.
A stainless channel specified in the right grade does none of that. It stays in service for the life of the building, and when the building is eventually demolished the steel goes back into the furnace as feedstock. For venues designed to serve communities for decades after 2032, that’s the sustainability case in one sentence.
“Durability matters more because you are not replacing it in the next 30 years.”
– Kevin Finn, Paige Stainless
The grade question: 304 or 316 for Games venues?
Choosing the wrong grade is the fastest way to turn a sustainable product into a replacement job.
- 316 for aquatic, coastal and wash-down areas. Grade 316’s ~2% molybdenum gives markedly better resistance to chloride pitting. It’s our default for pool decks, the Gold Coast and Sunshine Coast venues, and any stadium area that gets hosed down with treated water.
- 304 for internal, dry, low-chloride areas. Indoor sport centre corridors and dry entries.
- Indoor pool halls need extra thought. ASSDA guidance is that 304 and 316 suit components that are regularly washed and aren’t safety-critical load-bearers. Deck grates fall in that category. Suspended, unwashed fixings in the roof space don’t, and need higher-alloy grades. Build a freshwater wash-down into the facility’s cleaning schedule.
Paralympic accessibility: the drainage detail that can’t be compromised
The Paralympic Games follow the Olympics in 2032, and every venue will carry wheelchair users, cane users and athletes with vision impairment, during the Games and for decades after.
AS 1428.1 limits slotted openings in an accessible path of travel to 13 mm wide, oriented across the direction of travel. AS 1428.2 applies the same limit to gratings in walking surfaces. Our PAIGE STAINLESS HEELGUARD® wedge-wire has a 5 mm aperture: narrow enough for wheelchair castors, cane tips, stilettos and small toes, and it meets AS 3996 clause 3.3.6 for bicycle tyres.
Step-free entries matter as much as the grate. A level transition from a concourse to an indoor space, or from a village apartment to its balcony, needs a threshold drain to catch water before it reaches the door line. Detail it with the door supplier and waterproofer before the slab is poured, not after.
Why Queensland-made matters under Buy Queensland
The Queensland Procurement Policy 2026 took effect on 1 January 2026, with a 30% target for spend with Queensland small and medium businesses and a requirement to invite at least one Queensland supplier or SME to routine procurements. Head contractors on GIICA projects are structuring their supply chains to report against it.
For specifiers and contractors, a Queensland manufacturer simplifies that reporting and shortens the supply chain:
- Local fabrication. Our factory is in Caboolture, under an hour from Victoria Park and in the same region as the Moreton Bay Indoor Sport Centre.
- Design changes without a shipping delay. About 80% of what we make on any given day is a one-off design. When a set-out changes, the revised grate is made down the road, not re-ordered from overseas.
- Site support. We can be on site for set-out, measure-ups and pre-pour checks.
- Accountability. The manufacturer, the drawing office and the warranty are in one place.
Proven on major Queensland projects
Olympic venues are new, but the problems aren’t. We’ve solved the same drainage challenges on tier-one projects, Recent notable ones in Qld are:
- Queen’s Wharf Brisbane: curved PAIGE STAINLESS HEELGUARD® following building forms and pools, in 304 and 316, for AXIS Plumbing on a Multiplex-built project.
- Palmer Coolum Resort: 50 m of curved 316 grating, 3D-scanned and made to the millimetre.
- The Star Sydney: high-traffic hospitality drainage.
Paige Stainless has manufactured in Queensland since 1993 and has been an ASSDA member since 2006.
Specifier checklist for Brisbane 2032 drainage
Before issuing for tender, confirm:
- Certification: a current GreenTag (or other GBCA-recognised) certificate number you can verify, and which Green Star credits it counts toward
- Grade: 316 for aquatic, coastal and wash-down zones; 304 only where chloride exposure is low
- Load class: AS 3996 class matched to the real traffic, including service vehicles and event bump-in, not just pedestrians
- Accessibility: grate openings compliant with AS 1428.1/1428.2 in every accessible path of travel
- Slip resistance: an AS 4586 test result for the grate, not just “slip resistant”
- Interfaces: threshold drains coordinated with door supplier, waterproofer and plumber before the pour
- Documentation: data sheet, spec clause and drawings in the tender set (see our guide to tech data in our BIM content page.
- Local content: manufacturer location documented for Buy Queensland reporting
Conclusion
Strip away the slogans and a sustainable Olympics 2032 comes down to three things that can be checked: 6 Star Green Star ratings, local and sustainable procurement, and venues that keep serving communities long after the Games leave. The “climate positive” promise has softened, which makes those checkable requirements more important, not less.
Drainage is a small part of a stadium or an aquatic centre, but it’s a permanent one. Specified properly, in the right grade of stainless, from a certified Queensland manufacturer, it contributes to the Green Star score, meets Paralympic accessibility requirements, supports Buy Queensland reporting, and never needs replacing. Specified badly, it’s one of the first things to be dug up.
Working on a Brisbane 2032 venue? Send us the drawings, load classes and exposure zones, and we’ll come back with a specification, data sheets and drawings ready for your tender set. Contact us or call +61 7 5499 1511. Browse our technical data sheets.
FAQs
Is Brisbane 2032 still a climate-positive Olympics?
Not contractually. Brisbane’s 2021 host contract required a climate-positive Games, but a 2024 addendum replaced that with an aim to remove more carbon than the Games emit. The IOC says the underlying requirements haven’t changed; critics say the commitment is no longer enforceable.
What Green Star rating will Brisbane 2032 venues target?
New and significantly upgraded venues will target 6 Star Green Star, the GBCA’s “world leadership” rating.
Who is building the Brisbane 2032 venues?
The Games Independent Infrastructure and Coordination Authority (GIICA) is delivering 17 new and upgraded venues under a $7.1 billion program funded by the Australian and Queensland governments. The organising committee, Brisbane 2032, runs the Games themselves, including venue overlay.
How can building products contribute to a Green Star rating?
Through the GBCA’s Responsible Products program. Products with a recognised third-party certification, such as GreenTag, count toward Green Star Buildings materials credits when enough of a project’s materials (by cost) qualify.
Is stainless steel a sustainable choice for drainage?
Yes, on three counts. About 85% of stainless steel is recycled at end of life without loss of quality, it needs no coatings that break down, and correctly specified stainless drainage lasts the life of the building, avoiding the embodied carbon of replacements.
Should I specify 304 or 316 stainless for Olympic aquatic venues?
316. Its molybdenum content gives better resistance to chloride pitting from pool water and coastal air. For suspended, unwashed load-bearing fixings in indoor pool halls, ASSDA recommends higher-alloy grades.
Do drainage grates need to meet accessibility standards for the Paralympics?
Yes. Grates in an accessible path of travel must comply with AS 1428.1 and AS 1428.2, which limit openings to 13 mm. HEELGUARD® has a 5 mm aperture.
Can Queensland suppliers bid for Olympic venue work?
Yes, and they’re actively sought. The Q2032 Procurement Strategy applies Buy Queensland, and the Queensland Procurement Policy 2026 sets a 30% target for spend with Queensland SMEs. Most product supply flows through head contractors and their plumbing and civil subcontractors.
Sources
- Queensland Government, Brisbane 2032 sustainability
- GIICA, Our venues and One year on from the 2032 Delivery Plan
- Marcus Foth, Brisbane 2032 is no longer legally bound to be ‘climate positive’, The Conversation / Landscape Australia, April 2025
- Queensland Government, Q2032 Procurement Strategy
- GBCA, Responsible Products program
- Global GreenTag, HEELGUARD® certification
- ISSF / Team Stainless, stainless steel life cycle study
- ASSDA, Stainless steel for indoor swimming pools
- Outdoor Design, National Aquatic Centre vision unveiled